Project Overview
- Lined Laydown Area Constructed Using Concrete Dead Men
- Laydown Area, Bottom Ash
- Geotextile Tubes Used to Control Solids and Increase Volume in Active Ash Pond
- Geotextile Tubes While Being Filled
- Effluent Control in a Lined Laydown Area
- Drainage Sump for Controlled Pumping of Effluent
- Dead Men and Liner Over Asphalt
- Controlling Effluent from an Unlined Laydown Area
- Effluent Quality
- Clear Water Runoff from Geotextile Tube